Results 1 to 10 of 556
Thread: Dakar 2016
Threaded View
-
5th January 2016, 12:49 #11
- Join Date
- Jun 2003
- Location
- London, UK
- Posts
- 1,983
- Like
- 753
- Liked 638 Times in 330 Posts
Again shortened route
The day's timed section will therefore start shortly after the initially planned CP1 (after 112.91 km) and finish after 314 km as planned. As a result, the special will be slightly less than 200 kilometres in length.
3-minute recap of the European Rally Championship 2025 on he official channel: https://www.youtube.com/watch?v=Hto8oKDpM4I
2025 ERC News & Rumours